Paseo Rael WWTP Digesters

This project consisted of the construction of two new anaerobic digesters, an associated equipment building, power cogeneration equipment including a biogas conditioning system, and the installation of a new belt filter press. The build includes reinforced structural concrete, steel digester covers, masonry, a precast concrete roof, miscellaneous metals, process equipment, plumbing, HVAC, electrical, instrumentation and controls, painting, demolition of existing concrete structures, excavation, backfill, yard piping, sidewalks, and asphalt.

LOCATION
Santa Fe, NM

OWNER
City of Santa Fe